Technical Issues and Design criteria

Technical Issues and Design criteria

1. Technical Selection Issues
·  Know the regulations - treatment standards and design requirements.
·  Evaluate flows, loads, and peaking factors carefully ? the size and cost of the plant will directly relate to flows, loads, and peaks.
·  Consider an equalization tank to optimize treatment ? membrane is a barrier, therefore need to design for the peak flow.
·  Evaluate the whole life cost of each viable option.
·  Consider the complexity of O&M and who will manager.
·  Volume of sludge produced
·  Footprint, visual impact, noise and odour.
·  Phased construction.
2. Design Criteria

·  Design Criteria, 12,000mg/L
·  Design Sludge Age, 20 to 30 days
·  Typical Design Flux, 15gpd/ft2 or 25l/m2h
·  Relaxation Period, 5mins/hr
·  Permeate Recycle for Low Flow Periods
·  Estimated Membrane Replacement Period 7 to 10 years